This project provides hands-on learning experience, guided by our Learning Management Software.
It includes a one-year student subscription to the course and materials necessary for an individual student to complete the project.
Within the online course, you'll find step-by-step video instructions, lesson videos, and additional activities to help students raise state testing and ACT scores, and a certification portion that allows students to earn a micro-credential.
Individual Units in this Course:

Industry Design Challenge
The Mini-design challenge was just a warm-up. This is the real deal!
- Industry Design Challenge
- Team Report Card
- Individual Brainstorm #1, #2
- Small Group Brainstorm #1
- Group Report Submission
- 5-10 Hours

Fluid Power 3.0
Students investigate and apply Pascal’s law and Boyles Law as well as determine ratios between similar and dissimilar volumes acting on one another.
- Fluid Power: A Force for Change
- Fluid Power Literacy
- T-Shirt Launcher
- 9-12 Hours

Golf Course Development
Everything that students have done up to this point can be poured into creating a dream golf course. Talk about an introduction into Civil Engineering, this is it.
- Golf Course Development Assignment
- 10-14 Hours

Gantt and Flow Charts
The precision required to execute elements of an Engineered solution takes excellent planning.
Gantt and Flow Charts allow students to make such plans and stay on target.
- 1-2 Hours

Ethics
How do we deal with the advancements of the 21st Century when humanity’s privacy, their social standing, even their existence might be threatened? In this unit, students will think creatively about two of the challenges facing our society as the 21st Century unfolds.
- GPS Implants Assignment
- Gilbane Gold Assignment
- 3-4 Hours

Failure Modes and Effects Analysis
When you can spot all the possible failures in a design, you save a bunch of time, effort, and energy. Understanding and then applying these FMEA procedures as you look at products will get your students ready to look at their own projects and see those possible failures as well as the effects those failures can have.
- Pressure Cooker DFMEA Assignment
- 2-5 Hours

Engineering Work Experience
Time to look at what your students strengths and weaknesses are. How do those skills translate to the work world? Which of those skills can be improved through the class? Match those career dreams with work experience activities designed to improve those necessary skills.
- Engineering Work Exercises and Activities Assignment
- 1 Hour

Electrical Circuits 2.0
So students understand the basics of electricity, so what can you do with it? How about play with electrolytes? Explore the relationship between electricity and magnetism? How about learning what all those symbols mean so that you can read the foreign language that is electricity?
- Open and Closed circuits
- Conductors and Insulators
- Series and Parallel Circuits
- Magnetic Fields
- Making an Electromagnet
- 5-10 Hours

Dreams vs. Nightmares
As the 21st Century had gotten underway, we are starting to see our dreams and our nightmares become reality. Is the self-driving car really coming? Will I be able to ride a train a 700 miles and hour? However, our nightmares are also becoming real. Things like global warming and robots replacing humans. All these questions require thought to process. Students can begin think about what dreams they have for the engineering world, and what nightmares those dreams might create.
- Dreams VS Nightmares Quiz
- 1 Hour

Design and Modeling
Humans need shelter from the elements for comfort and survival. Using formulas and R Values of materials, students calculate, design and build scale models of emergency/homeless shelters.
- Emergency/Homeless Shelter Assignment
- 10-15 Hours